Menu

Test installation

De Meyer’s engineering team developed, with use of a virtual 3D environment, a complete installation for testing the forces plasterboards an withstand, with the upmost thought giving to the operators ergonomics. The installation was manufactured, and consequently installed with the client.

© 2018 De Meyer - Frank Van Dyckelaan 28 - 9140 Temse - Tel +32 3 766 33 33 - info@demeyer.be - VAT BE 0405 019 045 - sitemap